Church Street and N. 30th Street, Newark, Ohio The project included design of a 10 to 15’ deep storm sewer outfall trunkline, street replacements, a regional water quality basin, walks & curb ramps, utility relocations, water line relocations, traffic signal … Read More
Posted in ProjectsSteubenville, Ohio This ADR project involved the design of the replacement of 2,775 feet of existing 6 inch water main with new 8 inch water main. The water main was replaced along Lauretta Drive in the street from John Scott Highway … Read More
Posted in ProjectsHeath, Ohio ADR & Associates, Ltd. designed a two-lane roadway on new alignment. The design included storm sewer, sanitary sewer relocation, walks, asphalt path, ADA facilities and a 21 space parking lot.
Posted in ProjectsRiverside Park, Newark, Ohio ADR & Associates, Ltd. designed an improved canoe and kayak launch ramp located on the north bank of the Licking River at Riverside Park. The project included the design of the 12’ wide launch ramp, the … Read More
Posted in ProjectsFairfield County, Ohio. This federally funded Safe Routes to School (SRTS) project involved the design of new concrete sidewalks in the neighborhood adjacent to Violet Elementary School.
Posted in ProjectsMalta, Ohio Originally the Village of Malta, Morgan County Ohio retained the services of ADR to provide Construction Administration and Construction Management of the previously designed Phase 1, of a … Read More
Posted in ProjectsCity of East Liverpool, Ohio A street in critical need of repair, Bradshaw Avenue had multiple sinkholes open up in the months leading up to its rehabilitation due to aging waterline and poor pavement conditions. This project, once finished, will … Read More
Posted in ProjectsThe Village of Glenford saw the need to improve the sidewalk connectively within the Village to their various parks and neighbors. As well as Glenford Elementary School centrally located within the Village. The existing sidewalk system has many gaps leaving … Read More
Posted in Projects