Steubenville, Ohio
This ADR project involved the design of the replacement of 2,775 feet of existing 6 inch water main with new 8 inch water main. The water main was replaced along Lauretta Drive in the street from John Scott Highway to Garfield Avenue.
KEY PERSONNEL:
Project Principal: Russell Krock, PE
Project Manager: Ronald Bonnette, PE, PS
Lead Design Engineer: Douglas Holz, PE
Lead Construction Engineer: Nick Mill, PE
SUBCONSULTANTS:
Smart Services, Inc. – Surveying Services
Comments are closed.